Why High-Performing Wells Still Underperform
A well can be successfully drilled, completed and brought online and still fail to deliver the performance expected of it.
The problem is often not a single equipment failure or operational event. Performance can be lost through a chain of decisions involving reservoir understanding, completion architecture, formation damage, perforating, stimulation, production operations, intervention strategy and integrity management.
This practical Protekz Institute Capability Briefing examines where those decisions can go wrong and how better diagnostic discipline can improve technical and commercial outcomes.
During the briefing, we will explore
Why production decline should be treated as a signal rather than a diagnosis
Where completion decisions can create long-term performance constraints
How formation damage can undermine otherwise sound completion designs
Why workovers sometimes address symptoms rather than causes
How to distinguish reservoir, completion, mechanical and integrity-related problems
A practical framework for making better intervention decisions
Why well integrity and well performance need to be considered across the same lifecycle
Who Should Attend
This briefing is designed for:
Completion Engineers
Production Engineers
Well Intervention Engineers
Petroleum Engineers
Reservoir Engineers
Asset and Operations Personnel
Technical and Operations Managers
Technical Capability Leaders
Your Facilitator
Mike Etuhoko
Mike brings decades of international experience across well completion, intervention, production performance and well integrity in complex operating environments.
His experience spans technical delivery, major field operations, leadership and capability development across multiple international energy markets.
Historical industry programme records document his work in completion, workover, intervention, HPHT wells, sand control, well testing and production optimisation across operators including TotalEnergies, Shell, KPO and HCML.
Continue Developing Your Capability
The briefing introduces several of the decision challenges examined in greater depth during:
Successful Well Completion & Workover Practices
5-Day Applied Technical Programme
Future Cohort
September 21–25 | Virtual | US$4,495
October 26–30 | Calgary In-Person | US$4,995
December 14–18 | Virtual | US$4,495
No sales presentation disguised as a webinar. Participants should leave with useful technical questions and frameworks whether or not they enrol in a Protekz Institute programme.